International2cvFriends.com http://www.international2cvfriends.com/forum/ |
|
We have liftoff.....AZU 250 rebuild thread http://www.international2cvfriends.com/forum/viewtopic.php?f=7&t=6302 |
Page 11 of 19 |
Author: | AZL57 [ August 15th, 2020, 2:26 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
you have a wiring loom with one or 2 fuseboxes? |
Author: | 48pop [ August 15th, 2020, 10:10 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
Just one fusebox.......4 fuses |
Author: | 48pop [ August 15th, 2020, 10:21 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
Moving to 602 means cable accelerator rather than rod.....so new hole needed. Why so complicated at the bulkhead ..... Unreasonably strong spring, complicated locking......grrrrrrr Took ages.....to fit a single cable !! |
Author: | AZL57 [ August 15th, 2020, 10:24 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
OK will have look in the factory manuals. P.s. It is not that difficult. If you lay out the wiring loom as it should go. You see the couloured plugs of all items to hook up near the loom. Just connect colour to colour... |
Author: | 48pop [ August 16th, 2020, 10:10 am ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
yeah......I understand the concept but I think I must be colour blind I can't find any mauve or Violet terminations and I see a number of shades of brown !! My bulbs arrived yesterday so I'll get them installed and work on trial and error basis. Thank goodness my van does not have the electric window/air-con/ABS/traction control optional extras..... |
Author: | Geert [ August 16th, 2020, 10:41 am ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
The colours of the wiringloom starts to fade after some years . I had the same problem. I did it like you now, working on trial and error basis . Good luck ! |
Author: | AZL57 [ August 16th, 2020, 4:23 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
Well i did fin these triple schemes. Could this be the right ones? |
Author: | 48pop [ August 16th, 2020, 10:34 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
Cheers, thanks for the diagrams ! Through an elimination process, I managed to get most of it sorted. Still missing fuel gauge an oil warning light but im still looking Todays progress.... https://youtu.be/HTRgds6zg1o Exhaust blowing everywhere but some other issues to tackle first.... Fairly decent oil leak from right hand bank....seems to be higher up than oil tube seals.....Perforated pushrod tube??? Some inestigation needed. Also got the brakes bled Still getting there... Cheers Gerry |
Author: | AZL57 [ August 16th, 2020, 10:45 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
fuel gauge is a small yellow connector on the meter there should be a yellow dot of paint And the same for the purple one. On the tank there must also be a mass wire otherwise it 'won't work. There is also an mass wire on the complete speedo cluster. |
Author: | 48pop [ August 17th, 2020, 11:31 pm ] |
Post subject: | Re: We have liftoff.....AZU 250 rebuild thread |
Well.......stripped a million fixings from all of the front shroud and the bottom cylinder cowling so I could check the oil feed and the pushrod tubes..... Oil feeds all dry if a little rusty. Cleaned up all of the residual mess and fired the engine up. The problem was immediately apparent, a holed pushrod tube Some reading in the forums suggest a number of options: 1 replacement 2 aluminium welding/brazing rods 3 Chemical metal 4 Rubber patch and jubilee clip Since first two options involve head removal, I think I'm going to go with either 3 or 4 for the moment so that I can get the van on the road for the remainder of the summer and tackle the head in the winter..... Any preferences for option 3 or 4 ?? |
Page 11 of 19 | All times are UTC + 1 hour [ DST ] |
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group http://www.phpbb.com/ |