Post Re: Digging an inspection pit
Thanks Smiffy.

Why angle iron? I was planning to attach a square bit of timber to the outside of the top of the shuttering, and just cast the rebate for the boards straight into the concrete. When the concrete sets and the shuttering (and the bit of square section timber) comes out, there will be a suitable recess for the boards.

How do you hold the angle iron in place when casting concrete round it?

I can see angle iron would mean it would be easier to slide the boards about, but is it needed for strength?

_________________
Dennis usually in the Cantal

1964 HY 72 (Type H, campervan) - LHD
1969 AZU 250 (formerly French Post Office van) - LHD
1982 Red Special - RHD
1983 Burgundy/Black Charleston - RHD
2017 Skoda Octavia Estate 1.4 DSG - LHD


July 10th, 2014, 5:15 pm
Profile
Firing on two.
User avatar

Joined: December 17th, 2012, 10:03 pm
Posts: 966
Location: Luscan, Pyrenees, FRANCE
Post Re: Digging an inspection pit
Angle Iron also for the repeated movement of the boards - concrete on corners and edges will just erode and brake off over time, where the metal will act a little like a lintel over a door - it will take the wear and tear.

_________________
https://www.facebook.com/GNGLuscan
Image


July 10th, 2014, 10:23 pm
Profile WWW
Firing on two.
User avatar

Joined: November 29th, 2008, 10:05 pm
Posts: 9259
Location: West Sussex, U.K.
Post Re: Digging an inspection pit
Maybe worth looking at the jacks from a 4 post ramp, set the angle at the right width and you could run one of those jacks on it.

_________________
samfieldhouse wrote:
What I like about I2F is that there is no pretence of democracy.


July 10th, 2014, 11:17 pm
Profile
Firing on two.

Joined: April 22nd, 2009, 11:06 pm
Posts: 3684
Location: Ecosse
Post Re: Digging an inspection pit
the angle gives the edge strength cement it in place or pin it and then pour the slab make sure its sealed/ dammed up or the pour will head off down your pit!

lift! as all the stuff on the car that you think you need to do from the convenience of the pit is accessed from the side of the car. A pit lets you look at the blank underside of the chassis. A lift lets you work on everything at a back friendly height.

_________________
Kissing the Lash
Image
"Any advice of a technical nature is given on the understanding that I've actually done this shit, not just read about it in D*lly club mag some time ago.


July 11th, 2014, 8:23 am
Profile
2CV Fan

Joined: October 30th, 2009, 10:00 am
Posts: 77
Location: Farrington Gurney, Nr Bristol
Post Re: Digging an inspection pit
I dug a pit, finished size 6ft long and 3ft wide and it is great for the 2cv. The depth was my shoulder height. I cover it with3' x 6" x 2" planks. just use a step ladder to get in and out.
As it's not that long I work on the front or back and with the 2cv it's easy to move it from underneath.
Only thing I didn't do is line it and under extreme conditions it used to get water in it but hasn't done so lately.
Don


July 21st, 2014, 10:39 am
Profile
Display posts from previous:  Sort by  
Reply to topic   [ 15 posts ]  Go to page Previous  1, 2

Who is online

Users browsing this forum: No registered users and 122 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group.
Designed by STSoftware for PTF.